Wednesday, March 19, 2014

20% Project Update #8

Due to delays from academic and extracurricular activities, I haven't done much with my project progress. I added about 2 lines of notes to my sheet, which have to be edited later on. My CM Piano test is coming up as well, so it is difficult practicing for it while revising my piano music sheet at the same time. My final prouct is going along fine. After I am done editing my draft of the piano sheets, I am planning to input it on a sheet generstor for piano and print it out. Piano has been an entertaining hobby for me all my life so this project has been exciting. What bothers me now is the limited time I have left. Along with upcoming AP exams, working on my Eagle Scout project, waiting for college admittances,  my stress list seems to go on to no end. I'm neutral on what I feel about my progress. After next week though, I should be ready to go and push forward with my project.


                           http://www.npengage.com/wp-content/uploads/2012/04/stess.jpg

This picture is basically how I feel right now. A lot of things are going on, and I have little to no time to take a break and calm down.

No comments:

Post a Comment